Christopher Charles Lofts

Crawley and surrounding areas

New roof structure and stud walls built under a temporary roof

Here the new roof is framed up in timber, with rafters cut and fixed to the ridge and carried on purlins and struts. Below it, stud walls have been built out along the eaves and across the middle of the space, with OSB sheathing to one section and the new floor decked out ready for the next stage. The whole job sits under a scaffold with a corrugated temporary roof and sheeting to the sides, so the work stays dry while the structure goes up. Levels and straight edges are still in place on the plates as the framing is set out.

Give us a call

If we miss you, we'll be back in touch shortly

Christopher Charles Lofts, Crawley

Leave feedback

Built withTradeEasy

This website counts visits, without cookies, so Christopher Charles Lofts can see how people find it. How visits are counted

Leave feedback

What you write here is checked and then published on this website for anyone to read. How feedback works

To contact them privately instead — about a quote, or a job you want doing — use the enquiry form. It goes only to them.

Leave it unticked and your feedback is signed “A customer”.

Only used to send you the link that publishes your feedback. It's never shown on this website and never given to the business.

Were you given or offered anything for this?

Answering yes doesn't stop your feedback being published. It's shown with a note saying so, and we look into the business.